Construction key points of epoxy floor paint polishing machine
Nov 28, 2021
1. Epoxy primer
1. Make sure that the ground is clean before construction, and remove any debris that adheres;
2. Mix the epoxy resin and curing agent according to the correct ratio,
3. After mixing evenly, apply it with a scraper or roller.
4. Requires soaking to strengthen attachment.
5. After the first pass of drying and curing, apply the epoxy middle coat.
2. Epoxy middle coating
1. Make sure that the ground is clean before construction, and remove any debris that adheres;
2. Mix the epoxy resin and curing agent according to the correct ratio, and add a certain amount of quartz according to the ratio;
3. After mixing the sand evenly, pour it on the ground. Use a trowel to spread the material evenly according to the designed thickness to increase the strength and impact resistance; make the ground more solid and compressive.
4. After the intermediate coating is dry, use sanding to smooth the sags and particles on the surface.
5. Clean the dust.
Inspection method: Whether the construction handover is handled properly, the skirting line is straight, without separation from the wall, and is flat.
Three, epoxy putty layer
1. On a clean ground, stir the epoxy resin and quartz powder evenly according to the correct ratio, and then use a batch knife to evenly scrape on the ground to increase the combination between the middle coat and the surface layer, and further adjust the ground The flatness;
2. According to the actual number of construction passes, it is required to be smooth and without holes, no batch of knife marks and sanding marks shall prevail.
Inspection method: make the ground completely flat and without holes, and the surface coating construction can be carried out without a batch of knife marks and sanding marks.
Four, epoxy top coating
1. Keep it clean before construction, and remove any debris that adheres;
2. Stir the B component of the top coating material first; then add the curing agent to mix, and stir thoroughly;
3. Use a roller to evenly coat the material;
4. After the first coat is dry, apply the second top coat.
5. Scrape the trowel once with a trowel for artesian surface coating
6. Pay attention to the treatment of the junctions of successive construction; the coating is required to be uniform and no sagging.
Inspection method: the ground has uniform color, no sagging, no pinholes, smooth and smooth.
1. Make sure that the ground is clean before construction, and remove any debris that adheres;
2. Mix the epoxy resin and curing agent according to the correct ratio,
3. After mixing evenly, apply it with a scraper or roller.
4. Requires soaking to strengthen attachment.
5. After the first pass of drying and curing, apply the epoxy middle coat.
2. Epoxy middle coating
1. Make sure that the ground is clean before construction, and remove any debris that adheres;
2. Mix the epoxy resin and curing agent according to the correct ratio, and add a certain amount of quartz according to the ratio;
3. After mixing the sand evenly, pour it on the ground. Use a trowel to spread the material evenly according to the designed thickness to increase the strength and impact resistance; make the ground more solid and compressive.
4. After the intermediate coating is dry, use sanding to smooth the sags and particles on the surface.
5. Clean the dust.
Inspection method: Whether the construction handover is handled properly, the skirting line is straight, without separation from the wall, and is flat.
Three, epoxy putty layer
1. On a clean ground, stir the epoxy resin and quartz powder evenly according to the correct ratio, and then use a batch knife to evenly scrape on the ground to increase the combination between the middle coat and the surface layer, and further adjust the ground The flatness;
2. According to the actual number of construction passes, it is required to be smooth and without holes, no batch of knife marks and sanding marks shall prevail.
Inspection method: make the ground completely flat and without holes, and the surface coating construction can be carried out without a batch of knife marks and sanding marks.
Four, epoxy top coating
1. Keep it clean before construction, and remove any debris that adheres;
2. Stir the B component of the top coating material first; then add the curing agent to mix, and stir thoroughly;
3. Use a roller to evenly coat the material;
4. After the first coat is dry, apply the second top coat.
5. Scrape the trowel once with a trowel for artesian surface coating
6. Pay attention to the treatment of the junctions of successive construction; the coating is required to be uniform and no sagging.
Inspection method: the ground has uniform color, no sagging, no pinholes, smooth and smooth.